Status and First Results from the Upgraded PITZ Facility

Abstract : Since December 2004, the photo injector test facility at DESY in Zeuthen (PITZ) has been upgraded. A normal conducting copper booster cavity has been installed and the diagnostics beamline has been strongly modified. An extended water cooling system has been installed and was successfully taken into operation. Actually, the new diagnostics elements are being commissioned. After the installation of the new 10 MW klystron in June/July, the gun can be conditioned towards higher average power, and the whole beamline including the booster will be taken into operation. First results from the commissioning phase including gun and booster conditioning are reported.
Complete list of metadatas

Cited literature [9 references]  Display  Hide  Download

http://hal.in2p3.fr/in2p3-00026003
Contributor : Sabine Starita <>
Submitted on : Thursday, May 4, 2006 - 11:26:58 AM
Last modification on : Wednesday, September 16, 2020 - 4:24:29 PM
Long-term archiving on: : Saturday, April 3, 2010 - 10:26:14 PM

Identifiers

  • HAL Id : in2p3-00026003, version 1

Collections

LAL | CNRS | IN2P3

Citation

A. Oppelt, K. Abrahamyan, G. Asova, J. Bähr, G. Dimitrov, et al.. Status and First Results from the Upgraded PITZ Facility. 27th International Conference on Free Electron Lasers, FEL2005, Aug 2005, Palo Alto, United States. pp.564-567. ⟨in2p3-00026003⟩

Share

Metrics

Record views

334

Files downloads

149