Status of the SPIRAL2 injector commissioning

Résumé : The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.
Document type :
Conference papers
Complete list of metadatas

http://hal.in2p3.fr/in2p3-01189013
Contributor : Emmanuelle Vernay <>
Submitted on : Tuesday, September 1, 2015 - 9:14:08 AM
Last modification on : Wednesday, January 23, 2019 - 2:38:48 PM

Identifiers

Citation

T. Thuillier, J. Angot, C. Barué, P. Bertrand, J. L. Biarrotte, et al.. Status of the SPIRAL2 injector commissioning. 16th International Conference on Ion Sources (ICIS 2015), Aug 2015, New York City, United States. pp.02A733, ⟨10.1063/1.4935227⟩. ⟨in2p3-01189013⟩

Share

Metrics

Record views

293