s'authentifier
version française rss feed
HAL : in2p3-00281366, version 1

Fiche détaillée  Récupérer au format
9th International Workshop on Neutrino Factories, Superbeams and betabeams (NuFact 07), Okayama : Japon (2007)
Challenge of muon for cooling rings
J. Pasternak1
(2008)

In order to obtain cost effective design for the neutrino factory and a front end of the muon collider compact rings for muon ionization cooling have been proposed in various schemes. Nevertheless muon cooling rings show several difficulties, which make their design a very challenging subject. In order to obtain space necessary for injection/extraction systems, 4 m long straight section has to be matched to low beta cooling section. Adiabatic matching is discussed, which was proposed as a solution for broad momentum deviation.
1 :  LPSC - Laboratoire de Physique Subatomique et de Cosmologie
Physique/Physique/Physique des accélérateurs