Measurement of the Response Time of the Delay Window for the Neutron Converter of the SPIRAL2 Project - IN2P3 - Institut national de physique nucléaire et de physique des particules Accéder directement au contenu
Article Dans Une Revue Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment Année : 2014

Measurement of the Response Time of the Delay Window for the Neutron Converter of the SPIRAL2 Project

Résumé

Research and development of a safety system for the SPIRAL2 facility has been conceived to protect the UCx target from a possible interaction with the 200 kW deuteron beam. The system called "delay window" (DW) is designed as an integral part of the neutron converter module and is located in between the neutron converter and the fission target. The device has been designed as a barrier, located directly behind the neutron converter on the axis of the deuteron beam, with the purpose of "delaying" the eventual interaction of the deuteron beam with the UCx target in case of a failure of the neutron converter. The "delay" must be long enough to allow the interlock to react and safely stop the beam operation, before the beam will reach the UCx target. The working concept of the DW is based on the principle of the electrical fuse. Electrically insulated wires placed on the surface of a Tantalum disk assure a so called "free contact", normally closed to an electronic circuit located on the HV platform, far from the radioactive environment. The melting temperature of the wires is much less than Tantalum. Once the beam is impinging on the disk, one or more wires are melted and the "free contact" is open. A solid state relay is changing its state and a signal is sent to the interlock device. A prototype of the DW has been constructed and tested with an electron beam of power density equivalent to the SPIRAL2 beam. The measured "delay" is 682.5 ms (σ=116 ms), that is rather long in comparison to the intrinsic delays introduced by the detectors itself (2 ms) and by the associated electronic devices (120 ns). The experimental results confirm that, in the case of a failure of the neutron converter, the DW as conceived is enable to withstand the beam power for a period of time sufficiently long to safely shut down the SPIRAL2 accelerator.
Fichier non déposé

Dates et versions

in2p3-00994544 , version 1 (21-05-2014)

Identifiants

Citer

G. Acosta, T. André, J. Bermudez, M.F. Blinov, C. Jamet, et al.. Measurement of the Response Time of the Delay Window for the Neutron Converter of the SPIRAL2 Project. Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2014, 758, pp.83-90. ⟨10.1016/j.nima.2014.05.018⟩. ⟨in2p3-00994544⟩
42 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More